Welcome to the Highways Service Information Centre
On Wednesday 24 November 2021, Essex Highways received a pre-application response from the Planning Service within Essex County Council.
Read more
Members of the public were invited to an information event held on Thursday 1 October 2020 at Finchingfield Guildhall to meet and discuss our future proposals for Finchingfield Bridge with our Structures team, and to share feedback.
Topics for discussion included:
We would like to extend our thanks to everyone who was able to come along to our event, it was a pleasure to meet you all. For anyone who was unable to attend our event, further details on our current proposals are outlined below, along with some Questions and Answers on our proposals.
To share your feedback on future proposals, please contact either Finchingfield Parish Council, or Essex Highways by email.
Watch our visual demonstration as to how the new proposed bridge will look once constructed.
We will continue to work closely with Finchingfield Parish Council throughout this process.
Select a question to reveal/hide the answer:
It is an old bridge, some elements approximately 200 years old in a deteriorating condition. The bridge is also weak and cannot be strengthened to sustain the required loading. It is regularly struck by passing vehicles due to its narrow construction. These factors have been considered in opting to pursue reconstruction.
Once the final bridge design has been formalised and a contractor has been appointed for the works, we will have a better indication of construction timescales. In the meantime we are considering road closure of between six and nine months.
As reported in 2018, the intention is to dismantle the existing structure and replace the bridge with one built in the same location with a very similar look to the existing bridge. We anticipate reinforced concrete will be used in the core construction of the bridge, but with brickwork cladding installed to offer an outward appearance similar to the existing structure.
It is proposed the current width between the bridge walls will be maintained between new kerbs and a narrow hardened verge to offer some protection to the bridge parapets. These proposals will lead to a bridge that will be up to 1.5 metres wider overall, but maintaining the same road width, so that the bridge continues to act as a traffic calming feature.
At this stage we have obtained sufficient information to complete a new bridge design and have no current plans to close the bridge for further investigations.
Essex Highways will identify locations where their site compound/facilities can be located to ensure we minimise disruption to the local area as much as is reasonably practicable. However, it is likely that the areas of village green will be utilised.
Once a contractor has been appointed for the works, we will seek professional advice on how best to deal with this issue. It could be possible, that areas of the village green and features within it could be removed and stored safely, before being reinstalled once the works have been completed, like we did in October 2019.
There are no plans to include a footway as part of the project.
Trial hole investigations were carried out in late October 2019 to determine the precise location and depth of utility services in and around the village green areas. The investigation works have shown that it is technically feasible to install a temporary vehicle crossing across the village green. We continue to explore this as an option with the Parish Council.
As part of the temporary crossing option, various planning approvals will be required for the use of the village green areas.
This has not yet been decided, however it is something that members of the community can influence. We will continue to work closely with the Parish Council, to establish what material the community would prefer. Feedback from the recent public information event was that granite setts or cobbles may be preferred.
No and this is one reason why the hard standing areas will remain narrow in width. The hard standing areas have been introduced to protect the bridge parapets.
Our intention is to use the same bricks that were used in August 2020 when the parapet repairs were completed. These bricks are a close match in texture and colour to the bricks that were used to build the original bridge, some 200 years ago.
Yes, however the use of pre-fabricated materials will depend on how other construction complexities are resolved. Where possible, pre-fabricated materials will be used in efforts to reduce the overall construction programme
We will work with local stakeholders to try and minimise the impact on businesses and residents by completing the work without delays. However, when a highway authority or statutory undertaker carries out works under its statutory powers or duties, it is not liable to pay compensation for loss of trade. Traders have no right to any particular level of passing trade: business may fluctuate for a number of reasons.
Highway works benefit the whole community, including businesses and others who, while they might be adversely affected in the short-term, will benefit in the long-term. The highways authority has a statutory obligation to maintain the highway to a reasonable standard for the benefit of all road users.
We will continue to post updates about our proposals on both this and our Finchingfield Bridge, B1053, Finchingfield webpage.
Please check the Document Section at the bottom of the webpages where supplementary information will be published as it becomes available.
Details will also be shared with local parish councils about future works.
To share your feedback on future proposals please contact either Finchingfield Parish Council, or Essex Highways by email.
For details about other works in the area you can visit one.network, or follow the Essex Highways twitter feed: @essexhighways.
Finchingfield Bridge - Planning pre-application response - PDF(5.9MB)
Finchingfield Bridge - Essex Highways pre-application supporting document - PDF(4.8MB)