Cookies
We use cookies to give you the best possible experience on our website. You are free to manage this via your browser setting at any time or through the find out more link.
Close
Find out more
Cookie Portal
Manage and find out more about the cookies used on this website.
View Cookie Settings
Read Cookie Policy

Accept All Cookies and Close
Close Without Saving
< Back
This website has 4 types of cookies:
Your preferences will not take affect until the "save and close" button is clicked. To view our cookie policy please click here.
Strictly Necessary Cookies Used to help you move around the site and use its features. Without these cookies, it will be very hard to use the website.
Analytical/Performance Cookies Used to anonymously track visitors around the website so that we can improve your experience.
Functional Cookies Allows the website to remember your preferences and personalised your experience.
Targeted Marketing Cookies Allows adverts you see to be targeted to you and your interests.
Save and Close
< Back
< Back
Cookie Policy
< Back

Saffron Walden High Street, Slade Bridge

Latest News - 11 November 2019: Slade Bridge - Trial hole investigations postponed

We acknowledge local concerns relating to the planned temporary road closures of the High Street in November and have decided to postpone these until the New Year to avoid disruption during the Christmas shopping period.

Revised dates for these works are as follows:
• Saturday 11 January and Sunday 12 January 2020
• Saturday 18 January and Sunday 19 January 2020 (contingency date)

These investigation works will require a full closure of the road 24 hours a day from Saturday 7am until midnight Sunday on advertised dates.  During this time no vehicles will be permitted to pass through the worksite due to deep excavations.  These details may be subject to change if impacted by poor weather conditions.

The ecological survey of the structure will go ahead on Friday 15 November 2019 as planned as this work will not encroach on the carriageway.  During this time pedestrians are advised to use appropriate crossing points.

This will be reflected on One.Network

Highway Schemes Homepage

Works Location                     

 

Photos


About the scheme

Preparations are being made for works to take place on Slade Bridge which runs beneath the High Street in Saffron Walden. The purpose of the work is to replace the current bridge deck which is in a weakened condition.

Historical research and site assessment suggest that the earliest phase of culvert (arches) is of at least eighteenth century derivation. The bridge was partially replaced in 1964 by the current structure beneath the carriageway and a portion of the footways, and comprises of pre-stressed T-beams with an infilled concrete slab supported by mass concrete abutments. This is the part of the structure work will take place on.

 

The works

Before main works can take place site surveys and trial hole investigations are required to locate and record utility services that run through or near the bridge.

In order for investigations to take place, weekend closures are anticipated between King Street and George Street. During closure periods, appropriate diversions will be in place as no vehicles will be permitted to pass through the works.

Investigations will be carried out by accessing the culvert from the footway manhole and excavating the carriageway/footway. The findings from these investigations will support engineers planning the future replacement of the current bridge deck which is in a weakened condition.

The results of these investigations will support plans for the main works which are planned to take place in the 2021/22 financial year (provisionally summer 2021).

 

What is involved and how it may affect you

An ecological survey of the structure is planned to take place during the day time on Friday 15 November 2019, with entry being made via an access point in the footway. This work will not encroach on the carriageway although some barriers will be required around the work area.  Pedestrians are advised to use appropriate crossing points on the High Street while these works take place.

Weekend closures are anticipated on High Street between King Street and George Street on the following dates while the investigations are carried out:

  • High Street closed Saturday Saturday 11 January 2020 and Sunday 12 January 2020
  • High Street closed Saturday 18 January 2020 and Sunday 19 January 2020 (contingency date) 

Advanced warning notices will be in place prior to any works commencing and appropriate diversion routes will be implemented during road closures.

Whilst no vehicles will be permitted to pass through during road closures, pedestrian access will be maintained during these periods. 


Further information

Dates may be subject to change if affected by poor weather conditions or if unexpected issues arise. We aim to keep residents and businesses updated via this webpage and site signage or the @essexhighways twitter feed. For details about other roadworks in the area please visit: One.Network (formerly roadworks.org).

Documents

Diversion routePDF25/10/2019