Cookies
We use cookies to give you the best possible experience on our website. You are free to manage this via your browser setting at any time or through the find out more link.
Close
Find out more
Cookie Portal
Manage and find out more about the cookies used on this website.
View Cookie Settings

Accept All Cookies and Close
Close Without Saving
< Back
This website has 4 types of cookies:
Your preferences will not take affect until the "save and close" button is clicked. To view our cookie policy please visit our cookie policy page.
Strictly Necessary Cookies Used to help you move around the site and use its features. Without these cookies, it will be very hard to use the website.
Analytical/Performance Cookies Used to anonymously track visitors around the website so that we can improve your experience.
Functional Cookies Allows the website to remember your preferences and personalised your experience.
Targeted Marketing Cookies Allows adverts you see to be targeted to you and your interests.
Save and Close
< Back
< Back
Cookie Policy
< Back

Church Farm Culvert, High Street, Stebbing

Latest News - 07 April 2020: Church Farm Culvert: Progress Update

The temporary utility diversion work have been completed however, due to unexpected issues additional work was required which was not in the initial programme and took longer than anticipated to complete.

Delays have been experienced with a third-party company attending site to complete vegetation clearance which had a knock-on effect when the works on the relocation of the foul sewer could be scheduled. The foul sewer diversion works have recently been completed and work can continue.

Unfortunately, these activities have affected the overall programme and works are expected to be completed in July 2020.

Please be assured we are working with the contractor to try to reduce the impact these delays have had to the programme where possible will try to make up time.

Highway Schemes Homepage

Works Location                     

 

 

Photos

 





About the scheme

Church Farm Culvert is a brick arch structure located under the High Street in Stebbing, Uttlesford.  It consists of two structures, made from two separate construction methods which carries the road over an unnamed stream.

The culvert is in an unstable and deteriorating condition that requires replacing. The east bridge headwall is leaning away from the carriageway which has resulted in brick loss to the headwall’s face.  A ‘Give and Take’ priority arrangement remains in place as temporary measure.

Planning permission (planning application PP-07684645) is now granted.

We are now in a position to begin works on 6th January 2020, and are making preparations on this basis. 

Advance works - complete

UKPN carried out diversions to electrical supplies during December 2019 allowing main works to begin in January 2020. 


Proposed culvert works from 6 January 2020

We will remove both arches and headwalls of Church Farm Culvert, and replace the culvert with a new precast reinforced concrete box unit. This work is regarded as an efficient and cost effective option to bring the structure up to current standards, protecting its future use. We currently estimate these works will take approximately five months to complete, subject to the works not been impacted by poor weather or unexpected issues arising.

Site mobilisation is due to start from Monday 6 January 2020 which is likely to require some carriageway restrictions. Once the site is established, main works will begin and require a full road closure (currently anticipated week commencing 20 January 2020).  Dates may be subject to change at short notice so please check this webpage and signage on site for the latest information.

A full closure of the High Street at the structure will be required for the main works, 24 hours a day until the works are complete from Watch House Road for approximately 180 metres.

Advanced warning notices are in place and appropriate diversions will be in place during any planned road closures.

Some Clearway/No Parking areas have been identified to support traffic flows in the area to ensure safe manoeuvres can be carried out by large vehicles such as buses and emergency services.

Access to properties and businesses will be available from either side of the closure point, either via a formal diversion or local alternative routes. Pedestrian access will be maintained at all times.

Further updates will be made to the website and information becomes available and the scheme progresses.


Passenger Transport 

Due to the Coronavirus the current shuttle bus service in place has been running to a revised timetable. The decision has been made to change the current service to a dial-a-ride service with immediate effect. This is to ensure those that need to travel such as keyworkers still have access to the service. 

The dial-a-ride service will be operated by Arrows Taxis and will require passengers to pre-book two hours before travel by calling: 01621 874411.

If you have any queries regarding the passenger transport arrangements please either contact the operator directly, or the Essex Passenger Transport Team on 0345 603 2200. You can also follow the passenger transport twitter account: @Essex_pt 


School Transport

A shuttle service will also operate between Stebbing Warehouse Villas/New Pastures Lane and Stebbing Primary School to support parents and children only travelling to school. This service will be operated by Arrow Taxis.

The Stephensons school service 417 will divert via Dunmow to Bran End. The timetable can be downloaded from their website.


Further information

Our intention is to keep the community and local parish informed of details as information becomes available and the scheme progresses. The latest information will be reflected on this webpage as well as being shared with the parish and local councillors for them to share more widely.

Please note that dates and work programmes can be subject to change if affected by poor weather or if unexpected issues arise.

You may wish to follow the Essex Highways twitter feed: @essexhighways or find out about other works in the area by visiting one.network (formerly roadworks.org).