Essex Highways, Safer, Greener, Healthier

Braintree Schemes

Schemes that are being carried out or developed within Braintree district

Please select the relevant scheme from the menu or use the search below to filter the schemes.

The A120 at Galleys Corner roundabout is severely over-capacity at peak times and this has a significant detrimental impact on the movement of people and goods along the A120 in the wider area.
Information regarding the A131 Braintree to Sudbury Route Improvements.
The Braintree Integrated Transport Package (ITP) is a package of schemes with the aim of improving access to Braintree Town Centre. In addition to a number of traffic management measures for Braintree Town Centre
Information relating to works to replace the bridge deck at Hoppit Bridge, Braintree
Information relating to Fentons Farm Bridge which carries Fentons Road over the Flitch Way, Rayne
A key link into Braintree, it has been identified that there are a number of conflict points that deter cyclists from using the route despite the existence of an off-road cycleway. The planned cycle enhancements are aimed at assisting both cyclists and pedestrians and encouraging greater usage.
Details relating to Sturmer Station Bridge, we are currently considering measures to improve the river flow at this location, reducing the potential risk of flooding at the bridge.  
Information relating to works to improve the retaining wall on Sudbury Road, Gestingthorpe