Cookies
We use cookies to give you the best possible experience on our website. You are free to manage this via your browser setting at any time or through the find out more link.
Close
Find out more
Cookie Portal
Manage and find out more about the cookies used on this website.
View Cookie Settings
Read Cookie Policy

Accept All Cookies and Close
Close Without Saving
< Back
This website has 4 types of cookies:
Your preferences will not take affect until the "save and close" button is clicked. To view our cookie policy please click here.
Strictly Necessary Cookies Used to help you move around the site and use its features. Without these cookies, it will be very hard to use the website.
Analytical/Performance Cookies Used to anonymously track visitors around the website so that we can improve your experience.
Functional Cookies Allows the website to remember your preferences and personalised your experience.
Targeted Marketing Cookies Allows adverts you see to be targeted to you and your interests.
Save and Close
< Back
< Back
Cookie Policy
< Back

Marks Tey Station Bridge Vehicle Restraint System (VRS), North Lane, Marks Tey

Latest News - 04 November 2019: Revised Road Closure Dates – Marks Tey Station Bridge

A series of overnight road closures were proposed on North Lane at Marks Tey Station Bridge in November 2019 for preparations to install the Vehicle Restraint Barrier System to the railway bridge. These will not commence in November but now commence on Monday 13 January 2020. This is to avoid disruption to local residents, businesses and Greater Anglia in the build up to and during the Christmas period.

In order to carry out this work a temporary full road closure will be required and this will be put in place for all vehicles 24 hours a day over the bridge from Monday 13th January until July 2020. Arrangements are being made to ensure pedestrian access is maintained over the bridge. Further details will be provided nearer the time.

During the road closure a signed vehicle diversion will be in place via North Lane, Brook Road, New Road, A1124 Halstead Road, A1124 Essex Yeomanry Way, B1408 London Road, A120 Marks Tey Interchange, Station Road and vice versa.

For the latest information about the scheme please continue to check this webpage for updates. You may also wish to follow our twitter feed: @essexhighways

Highway Schemes Homepage

Works Location

 

Photos


Proposed diversion route during temporary closure of North Lane
 

About the scheme

Marks Tey Station Bridge is located to the east of Marks Tey Station and carries North Lane over the railway line.  The bridge is owned and maintained by Network Rail. 

We propose to install safety barriers, known as a vehicle restraint system (VRS), to all four points of the bridge.  The purpose of this system is to reduce the likelihood of a vehicle leaving the carriageway at the bridge/embankment.

 

The works

Preparations have been made to begin the installation of safety barriers at Marks Tey Station Bridge from Monday 13 January 2020.  This will require a full closure of the bridge on North Lane while these works take place.  

Advance warning notices will be in place and a signed vehicle diversion during the road closure.  We urge all drivers to observe the traffic management and signage in place during the works and take additional care and drive cautiously through the area.  In particular, please be aware that vehicles, including long vehicles travelling to and from businesses located on North Lane (north of Marks Tey Station Bridge), will have no alternative but to follow the diversion route during closures.

Arrangements are being made to ensure pedestrian access is maintained during these works.  Further details will be provided nearer the time.

The works are anticipated for completion in July 2020.  Please note that arrangements can sometimes be subject to change at short notice during unsuitable weather conditions or if unexpected issues arise.    

 

Further information

Please note arrangements can sometimes be subject to change at short notice due to unsuitable weather conditions or if unexpected issues arise.  The latest information will be reflected on site signage and this webpage.  Local residents, businesses and the parish council will be kept informed as details become available.

Works are subject to the necessary approvals being in place with Network Rail. 

For details about other roadworks in the area please visit: one.network.