Cookies
We use cookies to give you the best possible experience on our website. You are free to manage this via your browser setting at any time or through the find out more link.
Close
Find out more
Cookie Portal
Manage and find out more about the cookies used on this website.
View Cookie Settings
Read Cookie Policy

Accept All Cookies and Close
Close Without Saving
< Back
This website has 4 types of cookies:
Your preferences will not take affect until the "save and close" button is clicked. To view our cookie policy please click here.
Strictly Necessary Cookies Used to help you move around the site and use its features. Without these cookies, it will be very hard to use the website.
Analytical/Performance Cookies Used to anonymously track visitors around the website so that we can improve your experience.
Functional Cookies Allows the website to remember your preferences and personalised your experience.
Targeted Marketing Cookies Allows adverts you see to be targeted to you and your interests.
Save and Close
< Back
< Back
Cookie Policy
< Back

Abbotsford Bridge, Hall Road, Elsenham

Latest News - 16 January 2020: Abbotsford Bridge – planned road closure for gully works

Remedial works are planned to start on Monday 27 January 2020 and are expected to take approximately five days to complete.

Due to an existing low spot in the carriageway, there is an issue with excessive water pooling. A double gully will be installed and the kerbing will also be extended to resolve the issue.

This work was previously planned during the end of December but due to timeframes unfortunately was unable to be completed.

In order for this work to be carried out in a safe manner, a road closure at the bridge is required during working hours. The road will be closed to all traffic with the exception of buses from 8am to 5pm. Passengers using the 7 and 7a bus service please be advised there will be no change in service as buses will be guided through the closure during working hours. 

After each shift, barriers will be put in place to protect the work area and the road will reopen to all traffic. We urge all drivers to take additional care and observe traffic management and signage in place during the works. In particular, please be aware the width of the carriageway may be reduced to accommodate barriers during non-working hours.

Pedestrian access will be maintained at all times.

We would like to apologies for the temporary inconvenience to local residents and businesses these works may cause.

Highway Schemes Homepage

Works Location


Photos

About the scheme

Abbotsford Bridge is located to the south east of Elsenham and north of Stansted Airport.  It carries Hall Road, an unclassified road, over Stansted Brook.

The bridge, which consists of a culvert that runs under the road, was originally constructed in two different stages.  The original structure is a cast iron deck supported on cast iron girders constructed in 1880.  This was extended at a later stage on the east side.

Inspections have identified that the structure requires dismantling and replacing as it is now found to be in a weak and deteriorating condition. Bridge reconstruction works were completed in December 2019.


Remedial works 

Arrangements have been made to install a double gully and extend the kerbing to stop excessive water pooling in the carriageway. Works are due to commence on Monday 27 January 2020 and are expected to take approximately five days to complete.

In order for this work to be carried out in a safe manner, a road closure at the bridge is required during working hours. The road will be closed to all traffic with the exception of buses from 8am to 5pm. 

After each shift, barriers will be put in place to protect the work area and the road will reopen to all traffic. We urge all drivers to take additional care and observe traffic management and signage in place during the works. In particular, please be aware the width of the carriageway may be reduced to accommodate barriers during non-working hours.

Advance signage will be on site and following diversion will be in place during the road closure: Hall Road, B1051 (Henham Road, Mill Road, Thaxted Road), Church End, Brick End, Woodgates End, Chapel End, Molehill Green, Waltham Hall Road, Elsenham Road and vice versa.  Care has been taken to choose an appropriate diversion route suited to all vehicles which avoids narrow lanes at Pledgdon Green, i.e. Brick End Road, Henham and Church End Lane.

Pedestrian access will be maintained at all times.


Passenger transport

There will be no change in the 7/7a bus service. Buses will be guided through the road closure during working hours.

Further information

The work programme may be subject to change if works are affected by poor weather or if unexpected issues arise.

We will share the latest information about the works and progress updates on this webpage as information as the scheme progresses.For details about other roadworks in the area please visit: One.Network or the @essexhighways twitter feed.

Thank you in advance for your patience and co-operation while we undertake these necessary works.