Cookies
We use cookies to give you the best possible experience on our website. You are free to manage this via your browser setting at any time or through the find out more link.
Close
Find out more
Cookie Portal
Manage and find out more about the cookies used on this website.
View Cookie Settings
Read Cookie Policy

Accept All Cookies and Close
Close Without Saving
< Back
This website has 4 types of cookies:
Your preferences will not take affect until the "save and close" button is clicked. To view our cookie policy please click here.
Strictly Necessary Cookies Used to help you move around the site and use its features. Without these cookies, it will be very hard to use the website.
Analytical/Performance Cookies Used to anonymously track visitors around the website so that we can improve your experience.
Functional Cookies Allows the website to remember your preferences and personalised your experience.
Targeted Marketing Cookies Allows adverts you see to be targeted to you and your interests.
Save and Close
< Back
< Back
Cookie Policy
< Back

Parkway Corridor, Chelmsford

Works Location

Photos

A1060 Parkway - west of junction with A&N roundabout/flyover to Odeon Roundabout

Manor Road with Odeon Roundabout

A1099 High Bridge Rd/Baddow Rd (junction with Odeon Roundabout)

New London Road/Parkway Junction

About Parkway

 
 

Traffic accessing the centre of the city from routes including New London Road, Roxwell Road, Springfield Road, Waterhouse Lane, Broomfield Road, and Chelmer Road usually ends up travelling along Parkway to reach their destination. As a result, the Parkway corridor experiences significant congestion during peak periods, particularly in the city centre and at key junctions along the route. 

There are a significant number of buses which use Parkway (approximately 45 per hour in each direction) and which also suffer from increased journey times and poor journey time reliability as a result of the congestion along the corridor.

This scheme is being delivered as part of the Chelmsford City Growth Package

 

About the scheme 

Essex County Council has secured £15 million to undertake sustainable transport improvements to help alleviate pressure on Chelmsford’s road network.  

Following a public consultation on the Chelmsford City Growth Package during summer 2017, the decision was taken to progress plans for a package of improvements at key locations on Parkway between the junction with the Army and Navy roundabout and flyover and Victoria Road South.

Works are due to start early 2019 to make the following changes (improvements are listed in order travelling from west to east along Parkway):

 

A1060 Parkway - Improvements to road layout westbound (from junction with Army and Navy roundabout / flyover to Odeon roundabout):

We are simplifying the existing road layout and lane markings for westbound traffic exiting from the Army and Navy roundabout and flyover to allow for all three lanes of traffic to continue straight ahead at Odeon roundabout (towards A1060 Parkway westbound).  For traffic travelling from the Army and Navy flyover ahead and continuing westbound on the A1060 Parkway this will reduce the need to change lanes when approaching the Odeon roundabout.

The existing right-turn only lane on the approach to the Odeon roundabout is under-utilised, and this change will help to improve safety and traffic flow for all westbound traffic.

Works will include:

  • modifying existing splitter islands
  • changes to kerbing. 

 

Manor Road junction with the Odeon Roundabout:

This scheme will provide a safer, direct east-west route for people who walk or cycle between Rochford Road east and Rochford Road west. This will improve links to the Moulsham Street shopping area and the Odeon Roundabout subway and connect to the National Cycle Network 1 along the riverside at Kings Head Walk. 

The improvements will allow for safer crossing for the existing cycle route across Manor Road whilst having minimal impact on traffic approaching the roundabout.

Works will include:

  • Installing new directional cycle signage
  • Realigning kerbs
  • An enhanced central refuge on Manor Road, next to the Odeon roundabout.

 

A1099 High Bridge Road / Baddow Road (junction with the Odeon roundabout):

We will be making permanent the existing dedicated left turn restriction for traffic into Baddow Road. This formalises the current temporary restrictions, which have operated since 2011.

To access Baddow Road west from a westbound direction on Parkway, traffic will need to continue to the Market roundabout, U-turn and join the dedicated filter lane to turn left into Baddow Road west. This prevents Parkway through traffic being blocked in peak periods by cars wanting to get to the car parks.

As an additional safety improvement, we will be extending the existing kerb island on High Bridge Road to prevent the movement from the dedicated left turn lane straight onto High Bridge Road. This will help to prevent conflict with traffic exiting Baddow Road west and traffic exiting the roundabout onto High Bridge Road from the outside lane. This will also improve pedestrian safety at the adjacent crossing.

 

New London Road / Parkway Junction: 

At the junction with New London Road, there are long delays in all directions. The following changes will be made to improve travel time through the junction:

  • Extending the existing central reservation to restrict the existing straight-ahead (southbound) and right-turn (westbound) movements of buses from New London Road (north).
  • Widening New London Road (northbound approach) at its junction with Parkway within the existing highway boundary.

These changes will allow traffic in all other directions to keep flowing for longer and should improve overall travel time through the junction by more than 20%.

Over 90% of buses on all approaches to the junction should experience reduced journey times throughout the day, however, a small number of bus journeys from New London Road will take slightly longer in the morning peak period.  All other vehicles are expected to be able to get through the junction quicker.

 

Subways at junction of New London Road with Parkway:

To ensure that north-south cycle journeys on New London Road are not affected by the changes to the junction we will enhancing the existing subways at the junction to provide a safer route across the junction for people who cycle.

 

Victoria Road South:

Improvements to the eastern footways along Victoria Road South from the junction with Parkway northwards towards the railway station. This will make it easier and safer for people who walk or cycle to access the train station:

  • Providing a shared footway / cycleway along the eastern side to give improved links north and south (via Parkway and Bell Meadow) to Chelmsford City railway station
  • Converting the existing zebra-crossing to the north of Market Road junction to a new 'Parallel Crossing' which will allow cyclists to cross without dismounting. Pedestrians and cyclists will able to cross safely (using segregated areas) at the same time, with lane markings for their guidance.
  • Alterations to the exit area of the car park to provide a safer crossing point for pedestrians and cyclists.
  • Providing links to the cycle route through Burgess Springs to provide a safer, more direct route to the station cycle parking area. 

 

Bellmead:

  • Providing a shared footway / cycleway along the southern side between the junction with Parkway and the entrance to Bell Meadow at the existing zebra crossing to give an improved link to the existing cycle network within Bell Meadow.
  • Alterations to the exit onto parkway to provide safer crossing for both pedestrians and cyclists.

 

Parkway:

  • Providing a shared footway / cycleway along the northern footway to provide improved links to the subway at New London Road and links to the south of the city. 

 

 

When will the work take place and how may it affect you?

Works will begin in January 2019 and will be completed in phases. The majority of the works will be completed during the day time (between the hours of 9am and 7pm) during the working week with some Saturday morning working (between 9am and 1pm).

The current works timetable is shown below.   Please note that this information will be updated when more details are available.

Location

Date 

Detail of works 

Odeon Roundabout: 

  • A1099 High Bridge Road/Baddow Road
  • Manor Road

21 January 2019 

April 2019 - works are substantially complete.

Bellmead works / Victoria Road South:  23 April 2019 

From week commencing 23 April 2019, works will begin on the Bellmead phase.

This will be followed by works on the east side of Victoria Road South (moving from south to northerly direction), before commencing works on the west side of Victoria Road South (working in a northerly to south direction). 

Traffic management will be on site during overnight works (between the hours of 9.30pm and 6am), with traffic flows maintained throughout.  During the day time some signage and guarding will be visible to protect the works.


Throughout the various phases, traffic management will be necessary and temporary lane restrictions may be in place.

Please note that advertised dates may be subject to change for example if affected by poor weather or if unexpected issues arise.    

 

Further information

Updates will be available via this webpage including changes to the work programme, details regarding traffic arrangements such as temporary closures as well as local signage.

To view other works in the area please also visit: www.roadworks.org 

This scheme is being delivered as part of the Chelmsford City Growth Package.  For information about other schemes considered visit Chelmsford City Growth Package.