Cookies
We use cookies to give you the best possible experience on our website. You are free to manage this via your browser setting at any time or through the find out more link.
Close
Find out more
Cookie Portal
Manage and find out more about the cookies used on this website.
View Cookie Settings

Accept All Cookies and Close
Close Without Saving
< Back
This website has 4 types of cookies:
Your preferences will not take affect until the "save and close" button is clicked. To view our cookie policy please visit our cookie policy page.
Strictly Necessary Cookies Used to help you move around the site and use its features. Without these cookies, it will be very hard to use the website.
Analytical/Performance Cookies Used to anonymously track visitors around the website so that we can improve your experience.
Functional Cookies Allows the website to remember your preferences and personalised your experience.
Targeted Marketing Cookies Allows adverts you see to be targeted to you and your interests.
Save and Close
< Back
< Back
Cookie Policy
< Back

Thistley Green Bridge, Felsted Road, Felsted

Road Closure - 18 February 2020: Thistley Green Bridge – planting and remedial works

Following on from the strengthening work recently completed at Thiestley Green Bridge, there is a requirement to carry out some planting and minor remedial work in the vicinity of the bridge.

The work is scheduled for Saturday 29 February 2020 and will required a section of Felsted Road over the bridge to be closed for one day to all vehicles. The closure is necessary to safeguard members of the public and the workforce. 

Pedestrian and dismounted cyclists will be permitted access by the onsite team.

There will be a diversion route in place, which takes the following roads, Felsted Road, Main Road, Moulsham Hall Lane, School Lane and Vice Versa. Further information on the diversion route can be found on One.Network.

Highway Schemes Homepage

Works Location


Photos

View from road

View of brick arch

visible cracks in brick arch

About the scheme

Thistley Green Bridge is a circular brick arch structure on Felsted Road which is currently in a weak condition and in need of strengthening.  The bridge carries excess water from the River Ter and local farmland in times of flooding.


The works

Arrangements have been made to commence strengthening works from 14 October at Thistley Green Bridge.  This will involve lining the current circular brick arch with a reinforced concrete pipe to be inserted into the existing bridge.

We anticipate the works will be completed in early December 2019, subject to weather being suitable and no unexpected issues arising.


What is involved and how it may affect you

These works will require a full temporary closure of the road to all vehicles during the construction period from a point approximately 115m southeast of its junction with Hollow Road for a distance of approximately 100m in a southeasterly direction.

A signed diversion will be in place via Felsted Road, School Lane, Dumney Lane, Main Road, Moulsham Hall Lane, Great Leighs Bypass Roundabout, Bartholomew Green Road, Crix Green Road, Frenches Green Road, Bannister Green, Burnstie Road, Cock Green Road, Causeway End Road and vice versa.

The closure will safeguard members of the public and the workforce during the construction period as operatives will be working in the watercourse adjacent to and beneath the bridge. This will also provide the space needed to allow heavy plant and equipment to lift concrete pipe sections down onto the riverbed. 

Pedestrians and dismounted cyclists will be permitted access by the onsite team throughout the majority of the works, however please note this will not be possible when lifting operations are in progress. These are currently planned for week commencing 28 October and are expected to take approximately four days. 

A local pedestrian diversion route will be available for Public Rights of Way (PRoW 15_94) footpath access, to the northwest side of the bridge.

We endeavour to provide the latest information about the scheme, including any changes to the programme or traffic management as information becomes available.


Further information

Please note that the programme may be subject to change if affected by poor weather or if unexpected issues arise.

We aim to keep residents and businesses updated via this webpage and site signage.  Information will also be shared with local parish councils.